Sourcing toys from China is mostly about the details nobody puts on a price list: how the cartons are configured, which model the certificate actually covers, and how much of a container a product really fills. This checklist follows the order you will actually work through after an inquiry, and it covers the mistakes first-time buyers make most often.

1. Start with the carton, not the price

Most buyers open with "how much per piece?" The right first question is three things at once: pieces per carton (PCS), carton dimensions, and CBM per carton.

The reason is simple. Two suppliers can quote the identical unit price and still differ by 20% on landed cost, and the entire gap comes from packing efficiency.

  • PCS per carton drives warehouse picking and labour cost
  • CBM per carton decides how much ocean freight you pay per piece
  • Gross weight decides how many cartons fit when you load to a weight limit

A real example: two RC cars at the same unit price. Item A packs 36 pieces per carton at 0.148 CBM; item B packs 24 pieces at 0.11 CBM. Item A works out to 0.0041 CBM per piece, item B to 0.0046 — so A fits about 12% more goods per container.

2. Check that the certificate covers your model

A product advertised as CE may only have an EN71 test report for a different colourway or a different model. This is common practice in the industry and not necessarily dishonest — products in the same family often share one report number.

The risk to you is real though: if customs pulls the shipment and the model on the report does not match, the goods stop there.

Check three things:

  1. The report number — ask for the PDF, not a screenshot
  2. The model or item number on the report — it must match what you are ordering
  3. The standard version — EN71 has no fixed expiry, but the standards are revised (EN71-3 changed its migration limits in 2019)
A certificate that names a different item number is not a certificate for your order.

For North America you also need ASTM F963 plus CPSIA (lead content and phthalates). For the EU, check the REACH SVHC list, which is updated twice a year.

3. Catalog sample, pre-production sample, production sample are not the same thing

These three get mixed up constantly, but they prove very different things:

TypeWhere it comes fromWhat it proves
Catalog sampleStock in a showroom or warehouseGeneral appearance
Pre-production sampleMade from the production mould and materials, before mass productionDimensions, colour, packaging, function
Production samplePulled at random from the running lineActual production quality

What you must have before paying a deposit is the pre-production sample, and it should be a signed sample — one copy each side, kept as the reference for the later inspection.

Ordering on a catalog sample alone is the most common beginner mistake. Photos are lit and retouched; colour shift, dimension changes and missing accessories do not show up in them.

4. How to schedule the inspection

Third-party inspection is not a luxury. A general inspection at AQL 2.5 typically costs USD 300–500 per man-day, which is a small fraction of a 20GP shipment.

The points that matter:

  • Timing: go when at least 80% of production is finished and 100% is packed. Too early and you are inspecting samples, not goods
  • Standard: state the AQL level explicitly (commonly 2.5 for major defects, 4.0 for minor)
  • Who pays: usually the buyer, but it can be negotiated into the seller's side
  • What happens on failure: the contract should say rework, deduction, or rejection

The usual trap is a report full of minor defects with no agreed AQL level, leaving the supplier to argue it is acceptable. Put the AQL in the contract.

5. Five pricing traps worth knowing

Trap one: the unit price excludes tax. Some quotes are EXW, some are FOB Shenzhen; the real difference is 3–8%.

Trap two: LCL charged at the largest item's rate. Some forwarders bill a consolidated shipment at the rate of the biggest product in it, not the actual volume.

Trap three: certification billed separately. The quote looks cheap until each model needs CNY 2,000–5,000 of testing.

Trap four: is the MOQ per style or per order? These are very different numbers, especially when you are trialling several styles.

Trap five: packaging not included. Colour boxes, manuals, labels and barcodes are often priced separately.

6. What to put in the inquiry

An inquiry that lets the supplier quote accurately in one pass should contain:

  1. The item numbers you are comparing — list every one
  2. Target quantity per style, and whether mixed containers are acceptable
  3. Destination port — the port, not the country
  4. Certificates the target market requires — EU, North America and the Middle East differ
  5. Packaging requirements — colour box, labelling, manual language
  6. Required delivery window

The more specific the inquiry, the fewer rounds of questions and the sharper the price. A one-line "please quote" usually comes back with the most conservative number the supplier can offer.

7. Timeline after you place the order

A typical schedule to plan against:

  • Days 1–7: confirm and sign the pre-production sample
  • Days 8–15: material preparation and any new moulding
  • Days 16–45: production
  • Days 46–48: inspection
  • Days 49–52: booking, trucking, export clearance
  • Day 53 onward: ocean transit (about 14–18 days to the US West Coast, 25–30 to Europe)

In peak season (August to October, when everyone is building Christmas stock) sailings slip, so leave two weeks of buffer.


If you are evaluating suppliers, send them this checklist and read the reply. How precisely they answer is itself a screening step — the suppliers who answer clearly are usually the ones who also run a clear production line.